In the fields of life science research and biomedicine, animal laboratories, as indispensable scientific research platforms, directly influence the accuracy of experimental data and biosafety. With years of in - depth experience in the purification equipment industry, Guangzhou Cleanroom Construction Co., Ltd. provides full - cycle management services for animal laboratory projects, from initiation to acceptance, with professional technology and rich experience. We are committed to creating safe, efficient, and compliant experimental environments.
I. Initiation Phase: Precise Planning, Laying a Solid Foundation
(I) Requirement Research and Analysis
At the beginning of project initiation, our professional team conducts in - depth research to understand the actual needs of research institutions and enterprises. We comprehensively consider various dimensions, such as the types of experimental animals, experiment categories, and research scale, to accurately determine the functional positioning of the laboratory. For example, for the need to carry out transgenic animal experiments, special protective areas are planned in advance; if microbial experiments are involved, facilities requirements corresponding to the biosafety level are emphasized. Meanwhile, we collect users' expectations regarding experimental procedures, equipment configuration, and personnel operation habits, providing a basis for subsequent design.
(II) Feasibility Study and Budget Preparation
Based on the results of requirement research, we conduct a comprehensive assessment of the project's technical feasibility, economic rationality, and environmental adaptability. Industry experts are invited to analyze whether current technologies can meet the laboratory's functional requirements, ensuring the selected technical solutions are mature and reliable. At the same time, a detailed project budget is prepared, covering all expenses, including construction and decoration, purification equipment, experimental instruments, and personnel training, accurate to each material and service, to avoid project stagnation or quality decline due to insufficient budget in the later stage.
(III) Project Application and Approval
We assist clients in organizing and submitting all necessary documents for project initiation, including project feasibility study reports, environmental impact assessment reports, and biosafety risk assessment reports. Familiar with the approval processes and policy requirements of various regions, we actively communicate and coordinate with relevant departments to accelerate the approval process and ensure the project is successfully initiated.
II. Design Phase: Custom - made, Scientific Layout
(I) Functional Zoning Design
According to experimental procedures and biosafety requirements, functional areas such as animal breeding areas, experimental operation areas, clean areas, and contaminated areas are reasonably divided. Physical isolation and air flow control are adopted to avoid cross - contamination between different areas. For example, a unidirectional air flow design is used to make the air flow from the clean area to the contaminated area, ensuring the safety of the experimental environment. Meanwhile, personnel and logistics channels are optimized to realize the reasonable flow of people, goods, and air, improving experimental efficiency.
(II) Purification System Design
Leveraging the company's advantages in purification equipment production, we customize purification systems for animal laboratories. According to the laboratory's biosafety level and experimental requirements, appropriate air filtration equipment, temperature and humidity control systems, ventilation systems, etc., are selected. For example, in high - level biosafety laboratories, high - efficiency filters are used to ensure that the air cleanliness reaches Class 100 or even higher standards; intelligent temperature and humidity control systems are configured to control the temperature fluctuation within ±1℃ and the humidity between 40% - 60%, providing a stable and comfortable environment for experimental animals.
(III) Intelligent System Design
The concept of intelligent management is introduced to design access control systems, monitoring systems, environmental monitoring systems, equipment management systems, etc. Through the Internet of Things technology, real - time monitoring and remote control of laboratory environmental parameters and equipment operation status are achieved. When parameters such as temperature, humidity, and harmful gas concentration exceed the standard, the system automatically alarms and initiates emergency measures; the access control system can automatically control the access rights of each area according to personnel permissions and experimental arrangements, improving laboratory management efficiency and safety.
III. Construction Phase: Strict Control, Ensuring Quality
(I) Construction Team Formation and Management
A project team composed of professional engineers and construction personnel is formed, and the responsibilities and division of labor of each position are clearly defined. Construction personnel receive pre - job training to ensure they are familiar with construction drawings, technical requirements, and safety specifications. A strict construction management system is established, with the project manager responsible for the overall project. Regular project meetings are held to promptly solve problems that occur during construction, ensuring the construction progress and quality.
(II) Material and Equipment Procurement
Strict control is exercised over the quality of materials and equipment, and high - quality products that meet national standards and industry norms are selected. As a manufacturer of purification equipment, all core purification equipment provided by our company has passed strict testing and has stable and reliable performance. For other purchased materials and equipment, a supplier evaluation system is established to comprehensively evaluate the suppliers' qualifications, product quality, after - sales service, etc., ensuring that the purchased products meet the project requirements.
(III) Construction Quality and Progress Control
During the construction process, operations are carried out strictly in accordance with design drawings and construction specifications, and process quality inspection and acceptance are strengthened. After each construction process is completed, it is inspected by professional quality inspectors, and the next process can only begin after passing the inspection. A progress tracking mechanism is established, and a detailed construction progress plan is formulated. The actual progress is regularly compared with the planned progress, and construction arrangements are adjusted in a timely manner to ensure the project is delivered on time.
IV. Acceptance Phase: Meticulous and Flawless Completion
(I) Internal Pre - acceptance
After the project is completed, our company organizes an internal professional team to conduct a comprehensive pre - acceptance of the project. In accordance with design requirements and acceptance standards, a detailed inspection is carried out on the building decoration, purification system, electrical system, water supply and drainage system, etc. The operation performance of equipment and system functions are tested, and existing problems are identified and rectified in a timely manner.
(II) Third - Party Inspection and Acceptance
A qualified third - party inspection agency is invited to test the laboratory's environmental indicators, biosafety performance, equipment operation parameters, etc. The inspection contents include air cleanliness, temperature and humidity, pressure difference, noise, illuminance, microbial concentration, etc., to ensure that all indicators meet national standards and design requirements. According to the test results, we cooperate with clients to complete the formal acceptance of the project.
(III) Document Handover and Training
Project - related design drawings, construction records, equipment manuals, test reports, and other materials are sorted, archived, and handed over to clients. At the same time, equipment operation and maintenance training is provided to clients to ensure that laboratory staff are familiar with the equipment performance and operation procedures and master daily maintenance and simple troubleshooting methods, providing guarantee for the long - term stable operation of the laboratory.
Guangzhou Cleanroom Construction Co., Ltd. always takes customer needs as the guide. With professional technology, high - quality products, and perfect services, we provide full - cycle management solutions for animal laboratory projects. From initiation to acceptance, every link is carefully controlled, and we are committed to creating safe, efficient, and intelligent animal laboratories. If you have requirements for animal laboratory project construction, please feel free to contact us. We look forward to working with you to create a new future for scientific research!